Line 6: | Line 6: | ||
<!-- repo for this wiki: https://github.com/igemuoftATG/wiki2016 --> | <!-- repo for this wiki: https://github.com/igemuoftATG/wiki2016 --> | ||
+ | <!-- file built: Wed Oct 19 2016 23:32:26 GMT-0400 (EDT) --> | ||
+ | |||
</html> | </html> | ||
{{Toronto/head}} | {{Toronto/head}} | ||
Line 78: | Line 80: | ||
<div class="content" id="content-main"><div class="row"><div class="col col-lg-8 col-md-12"><div class="content-main"><h1 id="achievements">Achievements</h1> | <div class="content" id="content-main"><div class="row"><div class="col col-lg-8 col-md-12"><div class="content-main"><h1 id="achievements">Achievements</h1> | ||
<h3 id="bronze">Bronze</h3> | <h3 id="bronze">Bronze</h3> | ||
− | < | + | <p>We successfully <a href="https://igem.org/Team.cgi">registered</a> our team and plan to attend the Jamboree.</p> |
− | + | <p>We have met all deliverables. We have successfully documented our project on our <a href="https://2016.igem.org/Team:Toronto">wiki</a> along with our <a href="https://2016.igem.org/Team:Toronto/Attributions">attributions</a> and <a href="https://2016.igem.org/Team:Toronto/Parts">parts registry</a> by October 19th. We also plan to attend the jamboree and present our project and poster. Our judging form and safety form have been submitted on schedule, and we plan to submit our samples by the 21st.</p> | |
− | < | + | <p>We have completed our <a href="https://2016.igem.org/Team:Toronto/Attributions">attributions page</a>.</p> |
− | + | <p>We have documented all of our required <a href="https://2016.igem.org/Team:Toronto/Parts">parts</a>. | |
− | + | GEM and helped Ryerson iGEM set up their first iGEM team.</p> | |
− | < | + | |
− | + | ||
− | + | ||
− | < | + | |
− | + | ||
− | + | ||
− | </ | + | |
<h3 id="silver">Silver</h3> | <h3 id="silver">Silver</h3> | ||
− | < | + | <p>We have validated and characterized at least one additional BioBrick <a href="https://2016.igem.org/Team:Toronto/Parts">part</a>.</p> |
− | + | <p>We have <a href="https://2016.igem.org/Team:Toronto/Collaborations">collaborated</a> with Concordia to validate construct functionality and assisted and hosted events with iGEM teams.</p> | |
− | + | <p>We have demonstrated in depth <a href="https://2016.igem.org/Team:Toronto/HP-Silver">human practices</a> beyond the lab.</p> | |
− | + | ||
− | < | + | |
− | + | ||
− | + | ||
− | < | + | |
− | + | ||
<h3 id="gold">Gold</h3> | <h3 id="gold">Gold</h3> | ||
− | < | + | <p>We have demonstrated <a href="https://2016.igem.org/Team:Toronto/HP-Gold">integrated human practices</a> alluding to our project.</p> |
− | + | <p>We have <a href="https://2016.igem.org/Team:Toronto/Proof">proven that our cell-free system is functional</a> via an in vitro assay.</p> | |
− | < | + | <p>We have demonstrated that our project can work under <a href="https://2016.igem.org/Team:Toronto/Demonstrate">real-world-conditions</a>.</p> |
− | + | <p>We have further characterized 2013 York iGEM Gold sensing BioBrick <a href="http://parts.igem.org/Part:BBa_K1127008:Experience">BBa_K1127008</a> and added our results to the experience page .</p> | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
<h3 id="special-prizes">Special Prizes</h3> | <h3 id="special-prizes">Special Prizes</h3> | ||
− | <p><a href="https://2016.igem.org/Team:Toronto/ | + | <p><a href="https://2016.igem.org/Team:Toronto/Integrated_Practices">Integrated Human Practices</a></p> |
<p><a href="https://2016.igem.org/Team:Toronto/Model">Model</a></p> | <p><a href="https://2016.igem.org/Team:Toronto/Model">Model</a></p> | ||
<p><a href="https://2016.igem.org/Team:Toronto/Basic_Part">Basic Part</a></p> | <p><a href="https://2016.igem.org/Team:Toronto/Basic_Part">Basic Part</a></p> |
Latest revision as of 03:41, 20 October 2016
Achievements
Bronze
We successfully registered our team and plan to attend the Jamboree.
We have met all deliverables. We have successfully documented our project on our wiki along with our attributions and parts registry by October 19th. We also plan to attend the jamboree and present our project and poster. Our judging form and safety form have been submitted on schedule, and we plan to submit our samples by the 21st.
We have completed our attributions page.
We have documented all of our required parts. GEM and helped Ryerson iGEM set up their first iGEM team.
Silver
We have validated and characterized at least one additional BioBrick part.
We have collaborated with Concordia to validate construct functionality and assisted and hosted events with iGEM teams.
We have demonstrated in depth human practices beyond the lab.
Gold
We have demonstrated integrated human practices alluding to our project.
We have proven that our cell-free system is functional via an in vitro assay.
We have demonstrated that our project can work under real-world-conditions.
We have further characterized 2013 York iGEM Gold sensing BioBrick BBa_K1127008 and added our results to the experience page .