Team:Saint Rose School B/Results



Outcome

After all the work doing in the lab, we could say about the electrophoresis that the circuit parts are ready to introduce in a organism.

July 6th: Our samples failed to be clear.

July 22nd: Too heated, without result.

July 22nd: the sample was too heated again, and we did not abtained any result.

July 23rd: performed in a small chamber gel 1.5, with Plux promoter, we weren´t able to see the two bands as espected..

July 30th: No result was obtained from all samples, it will be repeated.

August 5th: the expected samples could be clearly seen, the third tends to have two bands.

August 10th: plasmids concentrates, all the samples were completely able to be seen, getting the expected result.

August 12th: we turned to repeat samples to make sure everything is correct, then the plasmids were sent to cryogenics.