Team:Northwestern/09 11

Notebook

Sunday, September 11th

Transformation Results:

    Figure 1: Positive transformation control

    Figure 1: Positive transformation control 2

    Figure 3: DsbA + Cas9.1 G-Block

    Figure 4: DsbA + Cas9.1 G-Block 2

    Figure 5: DsbA + Cas9.2 G-Block

    Figure 6: DsbA + Cas9.2 G-Block 2

    Figure 7: No insert negative control

    Figure 8: No insert negative control 2

Tasks:

Sam & Tasfia

  • Transformation (Cam)
    • 3 uL Cas9-TorA Gibson product assembled on 09.10.16
    • 1 uL transformation control