Line 37: | Line 37: | ||
<div id="March" class="panel-collapse collapse"> | <div id="March" class="panel-collapse collapse"> | ||
<ul class="list-group"> | <ul class="list-group"> | ||
− | <li class="list-group-item borderless"><b>March | + | <li class="list-group-item borderless"><b>March 03:</b> Brainstorming for subjects starts</li> |
<li class="list-group-item borderless"><b>March 24:</b> PI's Marjan and Yves join the team</li> | <li class="list-group-item borderless"><b>March 24:</b> PI's Marjan and Yves join the team</li> | ||
</ul> | </ul> | ||
Line 64: | Line 64: | ||
<div id="May" class="panel-collapse collapse"> | <div id="May" class="panel-collapse collapse"> | ||
<ul class="list-group"> | <ul class="list-group"> | ||
− | <li class="list-group-item borderless"><b>May | + | <li class="list-group-item borderless"><b>May 03:</b> Our iGEM application is officially accepted </li> |
− | <li class="list-group-item borderless"><b>May | + | <li class="list-group-item borderless"><b>May 04:</b> Presentation on possible subjects for PI Wim</li> |
− | <li class="list-group-item borderless"><b>May | + | <li class="list-group-item borderless"><b>May 06:</b> Six PhD students and one advisor join our team</li> |
<li class="list-group-item borderless"><b>May 17:</b> First meeting</li> | <li class="list-group-item borderless"><b>May 17:</b> First meeting</li> | ||
<li class="list-group-item borderless"><b>May 31:</b> We have our subject! | <li class="list-group-item borderless"><b>May 31:</b> We have our subject! | ||
Line 100: | Line 100: | ||
<div id="July" class="panel-collapse collapse"> | <div id="July" class="panel-collapse collapse"> | ||
<ul class="list-group"> | <ul class="list-group"> | ||
− | <li class="list-group-item borderless"><b>July | + | <li class="list-group-item borderless"><b>July 07:</b> |
<ul> | <ul> | ||
<li>Our <a style="margin-right: 0px; padding-right: 0px;" href="https://www.facebook.com/IGemUgent/" target="_blank">Facebook</a> and <a style="margin-right: 0px; padding-right: 0px;" href="https://twitter.com/igem_ghent" target="_blank">Twitter</a> page are live | <li>Our <a style="margin-right: 0px; padding-right: 0px;" href="https://www.facebook.com/IGemUgent/" target="_blank">Facebook</a> and <a style="margin-right: 0px; padding-right: 0px;" href="https://twitter.com/igem_ghent" target="_blank">Twitter</a> page are live | ||
Line 142: | Line 142: | ||
<div id="September" class="panel-collapse collapse"> | <div id="September" class="panel-collapse collapse"> | ||
<ul class="list-group"> | <ul class="list-group"> | ||
− | <li class="list-group-item borderless"><b>September | + | <li class="list-group-item borderless"><b>September 01:</b> |
<ul> | <ul> | ||
<li>The first batch of biotin is delivered: the work on the filament can begin | <li>The first batch of biotin is delivered: the work on the filament can begin | ||
Line 153: | Line 153: | ||
</li> | </li> | ||
− | <li class="list-group-item borderless"><b>September | + | <li class="list-group-item borderless"><b>September 06:</b> The first batch of our filament is made |
<div class="center"><video controls="" style="width: 500px; height:auto;object-fit: contain;"> | <div class="center"><video controls="" style="width: 500px; height:auto;object-fit: contain;"> | ||
<source src="https://static.igem.org/mediawiki/2016/d/d1/T--UGent_Belgium--pla_firstBatch.mp4" type="video/mp4" > | <source src="https://static.igem.org/mediawiki/2016/d/d1/T--UGent_Belgium--pla_firstBatch.mp4" type="video/mp4" > | ||
</video></div> | </video></div> | ||
</li> | </li> | ||
− | <li class="list-group-item borderless"><b>September | + | <li class="list-group-item borderless"><b>September 07:</b> We collaborated with the iGEM <a href="https://2016.igem.org/Team:Virginia" target="_blank">Virginia team</a> by filling in their survey</li> |
<li class="list-group-item borderless"><b>September 13:</b> | <li class="list-group-item borderless"><b>September 13:</b> | ||
<ul> | <ul> | ||
Line 219: | Line 219: | ||
<div id="October" class="panel-collapse collapse"> | <div id="October" class="panel-collapse collapse"> | ||
<ul class="list-group"> | <ul class="list-group"> | ||
− | <li class="list-group-item borderless"><b>October | + | <li class="list-group-item borderless"><b>October 01:</b> Developed a new 3D design, with an active surface area that is almost 20 times larger than the previous (third) version |
<div class="center"><img src="https://static.igem.org/mediawiki/2016/c/c6/T--UGent_Belgium--collectorV4.png" alt="Water collector version 4" height="320" width="400"></div> | <div class="center"><img src="https://static.igem.org/mediawiki/2016/c/c6/T--UGent_Belgium--collectorV4.png" alt="Water collector version 4" height="320" width="400"></div> | ||
</li> | </li> | ||
+ | |||
+ | <li class="list-group-item borderless"><b>October 07:</b> 3Ders did a <a href="http://www.3ders.org/articles/20161007-ugent-fights-water-scarcity-with-3d-printed-dewpal-water-collector.html" target="_blank">press article</a> on our project</li> | ||
<li class="list-group-item borderless"><b>October 26:</b> We're off to America!</li> | <li class="list-group-item borderless"><b>October 26:</b> We're off to America!</li> |
Revision as of 22:26, 9 October 2016
Notebook
- February 29:
- Application for iGEM is sent
- A team of four master students is assembled under guidance of PI Wim
- March 03: Brainstorming for subjects starts
- March 24: PI's Marjan and Yves join the team
- April 22: Three subjects are chosen, and a presentation is prepared
- May 03: Our iGEM application is officially accepted
- May 04: Presentation on possible subjects for PI Wim
- May 06: Six PhD students and one advisor join our team
- May 17: First meeting
- May 31: We have our subject!
- The work gets divided into four work packages, and team members are assigned
- June 15: Fablab is contacted to be a partner for 3D printing our collector, they accepted
- June 29: Abstract is written and added to site
- July 07:
- July 18: Our stay in America has been booked
- July 19: Work package 'shape' decides to use Autodesk Fusion 360 to shape the water collector
- July 22: Prof Dan Fernandez (CSUMB), who makes fog catchers, is interested to work with us
- August 15: The info video is made and put on the website
- August 30: Our first batch of PLA is delivered
- September 01:
- The first batch of biotin is delivered: the work on the filament can begin
- Steven, our advisor, met up with the EPFL team in Lausanne, Switserland. They immediately bonded
- September 06: The first batch of our filament is made
- September 07: We collaborated with the iGEM Virginia team by filling in their survey
- September 13:
- September 14:
- We printed three different prototypes of our water collector
- September 15: Our crowdfunding page is live!
- September 18: We made a temperature and humidity sensor with a Raspberry Pi so we can observe the environment while testing our 3D shape
- September 20: The water collector without biotin was tested for its water collecting efficiency
- September 21: We met with Winnie from ReaGent
- September 23:
- September 24: We made an experimental set up with a humidifier and our temperature and humidity sensor (cf. 15/09) to test the water collection of our shape
- September 26: We tried our INP: it works!
- September 29: A logo has been designed
- October 01: Developed a new 3D design, with an active surface area that is almost 20 times larger than the previous (third) version
- October 07: 3Ders did a press article on our project
- October 26: We're off to America!