Difference between revisions of "Team:Newcastle/Diary/Agenda/3108"

Line 75: Line 75:
 
<tr class="even">
 
<tr class="even">
 
<td>Simulation Models</td>
 
<td>Simulation Models</td>
<td>Kerry, Rupert, Kristina</td>
+
<td>Kerry, Rupert</td>
<td>In progress </td>
+
<td> </td>
 
</tr>
 
</tr>
 
</tbody>
 
</tbody>
Line 91: Line 91:
 
</tr>
 
</tr>
 
<tr class="odd">
 
<tr class="odd">
<tr class="even">
 
<td>Prepare the Presentation for Westminster</td>
 
<td>Westminster Team</td>
 
<td>Done</td>
 
</tr>
 
<tr class="odd">
 
<td>Write the Abstract</td>
 
<td></td>
 
<td>Done</td>
 
</tr>
 
<tr class="even">
 
<td>The Chronicle Article</td>
 
<td>Outreach and Funding</td>
 
<td>Done</td>
 
</tr>
 
<tr class="odd">
 
<td>Prepare cloning strategy documents for the alternative bricks and identify which ones we want IDT to synthesise.</td>
 
<td>Alternative Constructs</td>
 
<td>Done </td>
 
</tr>
 
<tr class="even">
 
<td>PCR Plasmids for our Construct</td>
 
<td>Lightbulb</td>
 
<td>Done</td>
 
</tr>
 
<tr class="odd">
 
<td>Contacted Animation Companies </td>
 
<td>Simulation</td>
 
<td>Done</td>
 
</tr>
 
<tr class="odd">
 
<td>Source platinum wire for the electrodes</td>
 
<td>Component</td>
 
<td>Done</td>
 
</tr>
 
<tr class="even">
 
<td>Look into how Reading and Bielefeld made improvements to their respective fuel cells.</td>
 
<td>Battery</td>
 
<td>Done</td>
 
</tr>
 
<tr class="odd">
 
<td>Investigate ways of engineering the bacteria so that electrons could be transferred to the mediator M. blue faster (e.g. by making the cell more porous) </td>
 
<td>Battery</td>
 
<td>Done</td>
 
</tr>
 
<tr class="odd">
 
<td>Adapt COMSOL model for smaller containers (microfluidics etc.)</td>
 
<td>Simulation</td>
 
<td>Done</td>
 
</tr>
 
<tr class="odd">
 
<td>Skyped Edinburgh for collaboration confirmation </td>
 
<td>Outreach and Funding</td>
 
<td>Done</td>
 
</tr>
 
<tr class="even">
 
<td>Investigate other ways of engineering the fuel cell to increase efficiency (e.g. mixed culture etc).</td>
 
<td>Battery</td>
 
<td>Done</td>
 
</tr>
 
<tr class="odd">
 
<td>Incorporating ethics/human practices into our design</td>
 
<td>Simulation</td>
 
<td>Done</td>
 
</tr>
 
<tr class="odd">
 
<td>Pro and Cons for Foundational Advance track selection and distribute.</td>
 
<td>Admin</td>
 
<td>Done</td>
 
</tr>
 
<tr class="odd">
 
<td>IWBDA</td>
 
<td>Lauren, Josh, Jake, Kristina</td>
 
<td>Done</td>
 
</tr>
 
<tr class="even">
 
<td>Westminster Meetup</td>
 
<td>Ollie, Kerry, Rupert, Emilija</td>
 
<td>Done</td>
 
</tr>
 
<tr class="odd">
 
<td>Track Selection </td>
 
<td>Everyone</td>
 
<td>Done</td>
 
</tr>
 
 
<tr class="even">
 
<tr class="even">
 
<td>Sponsorship Opportunities </td>
 
<td>Sponsorship Opportunities </td>

Revision as of 15:52, 30 August 2016





Date 31/08/2016
Time From 15:00
Place CBCB Level 2 Meeting Room
Attendees Emilija (chair), Kerry (minutes), Jake, Lauren, Rupert, Ollie
Apologies Kristina (work), Josh (away)
Previous Meeting 24th August 2016

Meeting Agenda

Agenda

  1. Apologies

  2. Approval of minutes from last meeting

  3. Recap of deadlines

    1. 2nd September – InterLab Data Due

    2. 9th September – Team Rosters Due

  4. Action items.

    1. Standing

Action Points Responsible Team Status
Investigate heating effect of various concentrations of agarose gel. Component
Check over RuleBender models to ensure rate constants are OK Simulation
Graphics for wiki bio cards Wiki
Simulation Models Kerry, Rupert
  1. Completed Items

Task Responsible Team Status
Sponsorship Opportunities Outreach and Funding Done
Conduct Flow Cytometry InterLab Study Interlab Done
    1. Breadboard – Rupert

      1. Report

    2. Component – Jake

      1. Report

    3. Alternative Constructs– Jake

      1. Report

    4. Simulations - Kerry

      1. Report

    5. Wiki – Rupert

      1. Report

    6. Battery – Josh

      1. Report

    7. Admin – Emilija

      1. Report

    8. Light Bulb – Lauren

      1. Report

    9. Interlab - Emilija

      1. Report

    10. Outreach and Funding - Ollie

      1. Report

  1. 2. Abstract

    3. Any other business.

    4. Next Meeting