Line 6: | Line 6: | ||
.imgDescription { | .imgDescription { | ||
position: absolute; | position: absolute; | ||
− | bottom: | + | bottom:45px; |
left:5px; | left:5px; | ||
padding-right: 5px; | padding-right: 5px; |
Revision as of 21:20, 30 July 2016
Contact Us
Our weekly progress. For a list of our protocols, visit the Protocols page
Contents
Week 1: May 23 - May 27
- Training begins
- Grow Top 10 competent cells.
- Brainstorm genetic circuits for a thallium sensor
- Lab safety training
Week 2: May 31 - June 3
Wet Lab
- Test efficiency of competent cells
Cell-Free Extract
- Test cell-free extract reaction with T7-GFP plasmid
Dry Lab
- Contact museums and summer programs for outreach opportunities
- Lab safety training
Back to Top
Week 3: June 6 - June 12
Wet Lab
Reporter
- Transform T7 promoter, amilCP, and terminator
- Begin assembly by ligating linearized T7 promoter and amilCP
Dry Lab
- Contact museums and summer programs for outreach opportunities
Back to Top
Week 4: June 13 - June 17
Wet Lab
Reporter
- Transform T7-GFP plasmid, lacZ alpha fragment, and eGFP
- Send promising T7 promoter -- amilCP ligations to be sequenced
- Perform double digest of T7 promoter and terminator from last week
- Ligate double-digested T7 promoter to new reporters (lacZ and eGFP)
Dry Lab
- TECBio, DiSCoBio, and Tissue Engineering Camp outreach opportunities set
Back to Top
Week 5: June 20 - June 26
Wet Lab
Cell-Free Extract
- Reaction volume can be reduced to 5 μL with 5 ng/μL of DNA
Toehold Switch
- Collins triggers activate the switches (both in plasmid form) to express LacZ
Reporter
- Ligate T7 promoter -- amilCP construct to terminator
- Extract successful ligations of T7 promoter to eGFP
- Ligate T7 promoter -- eGFP construct to terminator
Dry Lab
- Reach out to teams to collaborate based on last year's projects
Back to Top
Week 6: June 27 - July 3
Wet Lab
Cell-Free Extract
- Reaction volume can be reduced to 1 μL with 5 ng/μL of DNA
Toehold Switch
- Collins plasmids express LacZ with 25 ng of switch
- DNA oligos trigger Collins switches
Reporter
- Identify successful ligations to terminator for amilCP and eGFP consturcts using a gel
- Send correct plasmids for sequencing for confirmation
- Test plasmids in cell-free extract
- amilCP does not produce color in cell-free reaction
- eGFP produces fluorescence comparable to that from the Collins T7-GFP plasmid in cell-free reaction
- Linearized plasmids containing only the promoter and insert (no terminator) do not express protein
Dry Lab
- Work on outreach presentation for tissue engineering camp
Back to Top
Week 7: July 5 - July 8
Wet Lab
Cell-Free Extract
- 384-well plate requires at least 10 μL of reaction
DNAzyme
- Anneal PO strand with catalytic strand, both with and without erbium
- Test success of annealing reaction in cell-free extract and with acrylamide gels
Reporter
- Sequenced amilCP construct does not contain amilCP
- Unsuccessfully linearize and amplify eGFP construct using PCR
Dry Lab
- Practice outreach presentation for tissue engineering camp
- Develop DNAzymes for other heavy metals
Back to Top
Week 8: July 11 - July 17
Wet Lab
Cell-Free Extract
- Linear eGFP construct does not produce a stronger signal than its plasmid form
DNAzyme
- DNAzyme duplex does not trigger toehold switch
- Erbium cleaves the P substrate strand
Reporter
- Restart amilCP cloning process
Dry Lab
- First presentation at Camp BioE
- Prepare for UMD Mid-Atlantic Meet-Up
- Contact PLSG and NEB for sponsorship
Back to Top
Week 9: July 18 - July 22
Wet Lab
Cell-Free Extract
- Reactions can be diluted by one-half and still produce visible results in two hours
DNAzyme
- dPAGE assay of P substrate cleavage suggests that the DNAzyme works, but results are not definitive
- Six-hour time course of cleavage does not yield much additional information
- Reaction temperature (room temperature versus 37°C) does not produce observable effect on cleavage rates
Reporter
- Continue amilCP cloning process
- Clone RBS-T3 RNA polymerase to add into other constructs
Dry Lab
- Presentation at Camp BioE
- UMD Mid-Atlantic Meet-Up
- Continue fundraising
- Discuss systems to model
Back to Top